|
Fitting A
SpikeCamp, Siwash or Late Season
|
|
|
|
| STEP 1. Load the pack with about 25 pounds, put it on and tighten the waistbelt securely. Center stitchline on the belt should be right over your hipbone points. |
|
STEP 2. Pull down on the shoulder straps to wrap them snugly around your shoulders. |
|
STEP
3. Pull the bottom Delta strap (on your
waistbelt) til snug. Pull the load into your lumbar area with the top strap. This will
ensure a stable ride and great fit. |
|
|
|